Influence of Project Planning on Performance of Kigali City Clean Water Supply Expansion Project in Gasabo District, Rwanda

Authors

  • Umutesi Asfat Tania
  • Naomi Njoroge

DOI:

https://doi.org/10.53819/81018102t3199

Abstract

This study assessed the influence of project planning, operationalized as scope planning, time scheduling, and cost and budget planning, on the performance of the Kigali City Clean Water Supply Expansion Project in Gasabo District, Rwanda. A descriptive and correlational design with a quantitative approach was used, complemented by interviews and document analysis. The target population was 212 stakeholders (project managers, engineers, and planning, finance, procurement and supervisory staff). A sample of 139 was drawn using Yamane's formula through stratified random and purposive sampling, and 131 questionnaires (94.2%) were returned. Structured five-point Likert questionnaires were the main instrument, with Cronbach's alpha between .887 and .926. Data were analyzed in SPSS Version 27 using descriptive statistics, Pearson correlation, multiple regression and ANOVA. Respondents agreed that scope planning (M = 4.17), time scheduling (M = 4.21), and cost and budget planning (M = 4.20) were well practised, and rated project performance highly (M = 4.27). All three dimensions significantly predicted performance: time scheduling (β = .432, p < .001), cost and budget planning (β = .351, p < .001), and scope planning (β = .283, p < .001). Together they explained 84.1% of the variance in performance (F = 222.401, p < .001), and all three null hypotheses were rejected. The study recommends that the Water and Sanitation Corporation Group, the Ministry of Infrastructure and partners institutionalize integrated planning, adopt digital scheduling tools, secure timely release of funds, and tighten scope change control.

Keywords: Project Planning, Scope Planning, Time Scheduling, Cost and Budget Planning, Project Performance, Water Supply, Rwanda

Author Biographies

  • Umutesi Asfat Tania

    Mount Kigali University, Rwanda

  • Naomi Njoroge

    Mount Kigali University, Rwanda

References

Ackoff, R. L. (1974). Redesigning the future: A systems approach to societal problems. Wiley. https://books.google.com/books?id=QcBYAAAAMAAJ

Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6

Boateng, K., & Adusei, A. (2021). Budget planning and performance of municipal water projects in Ghana. Journal of Water and Development, 12(3), 310–329.

Chikodzi, D. (2021). Cost and budget planning in urban water supply projects: Lessons from Mozambique. African Journal of Civil Engineering, 15(2), 145–162.

Chikopa, M., & Moyo, R. (2022). Time scheduling and service delivery in Zimbabwean urban water projects. Water Policy and Planning Journal, 8(1), 67–89.

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE.

Cronbach, L. J. (1951). Coefficient alpha and the internal structure of tests. Psychometrika, 16(3), 297–334. https://doi.org/10.1007/BF02310555

European Investment Bank. (2021). Infrastructure investment and project performance in Europe: Lessons learned.

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.

Karekezi, C. (2024). Effect of project planning on water supply projects performance in Rwanda: A case study of Kirehe water supply project. University of Rwanda Digital Repository. https://dr.ur.ac.rw/handle/123456789/2635

Kerzner, H. (2022). Project management: A systems approach to planning, scheduling, and controlling (13th ed.). Wiley. https://books.wiley.com/titles/9781119805373/

Kothari, C. R., & Garg, G. (2019). Research methodology: Methods and techniques (4th ed.). New Age International.

Li, X., & Zhang, Y. (2022). Water infrastructure megaprojects in China: Planning and execution challenges. Journal of Infrastructure Management, 14(2), 101–118.

Ministry of Infrastructure. (2021). Kigali Bulk Water project to address water shortage issues in the City of Kigali and in Bugesera District, Minister Gatete. https://www.mininfra.gov.rw/updates/news-details/kigali-bulk-water-project-to-address-water-shortage-issues-in-the-city-of-kigali-and-in-bugesera-district-minister-gatete

Mutahi, P., & Karanja, D. (2021). Time scheduling practices and project performance in Nairobi water supply projects. East African Journal of Infrastructure Management, 10(2), 98–123.

Mutahi, P., & Karanja, D. (2022). Cost planning and service delivery in Kenyan urban water infrastructure. Journal of Water Resources Planning and Management, 148(6), 402–419.

Mutoni, H., & Afolabi, L. (2024). The role of effective planning on performance of Kigali Bulk Water Supply Project in Kanzenze Cell in Bugesera District, Rwanda. Journal of Entrepreneurship & Project Management, 8(1), 40–54. https://doi.org/10.53819/81018102t2317

Namusoke, A., & Okello, J. (2021). Time management challenges in urban water projects in Uganda. Uganda Journal of Water Resources, 5(2), 77–101.

National Institute of Statistics of Rwanda. (2025). Water and sanitation statistical report 2023/24. Republic of Rwanda. https://www.statistics.gov.rw

Ncube, T., Chikodzi, D., & Moyo, R. (2022). Budget planning and performance of urban water projects in Zimbabwe. Journal of African Water Management, 6(3), 180–202.

Office of the Auditor General of State Finances. (2025). Annual audit report for the year ended 30 June 2024.

https://www.oag.gov.rw/fileadmin/REPORTS/ANNUAL_AUDIT_REPORT_2024.pdf

Ojo, A., & Bello, S. (2021). Financial planning and municipal water project outcomes in Nigeria. Journal of African Infrastructure, 14(1), 55–74.

Osei-Tutu, P., & Mensah, S. (2021). The effect of scope planning on urban water project performance in Ghana. West African Journal of Engineering, 22(4), 210–235.

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) and the standard for project management (7th ed.).

Turner, J. R., & Zolin, R. (2012). Forecasting success on large projects: Developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames. Project Management Journal, 43(5), 87–99. https://doi.org/10.1002/pmj.21289

UNICEF. (n.d.). Water, sanitation and hygiene (WASH): Budget brief 2024/2025. https://www.unicef.org/rwanda/media/6446/file/UNICEF_Rwanda_Budget_Briefs_2024_2025_WASH.pdf.pdf

von Bertalanffy, L. (1968). General system theory: Foundations, development, applications. George Braziller.

Wanjiku, M., & Omondi, P. (2022). Scope planning and service delivery outcomes in Nairobi water projects. Kenya Journal of Infrastructure Development, 9(3), 134–156.

Water and Sanitation Corporation Group. (2024). Kigali City clean water supply expansion project: Performance review.

World Bank. (2023). Project performance assessment report: Urban water infrastructure. https://www.worldbank.org

Yamane, T. (1967). Statistics: An introductory analysis (2nd ed.). Harper & Row.

Downloads

Published

2026-11-10

Issue

Section

Articles

How to Cite

Tania, U. A., & Njoroge, N. (2026). Influence of Project Planning on Performance of Kigali City Clean Water Supply Expansion Project in Gasabo District, Rwanda. Journal of Entrepreneurship & Project Management, 10(6), 45-56. https://doi.org/10.53819/81018102t3199

Article metrics

Views: 41
Downloads: 24

Most read articles by the same author(s)