Influence of Monitoring and Evaluation Planning Practices on Performance of Education Projects in Karongi District, Rwanda

Authors

  • Byamukama Didier Mount Kigali University
  • Dr. Njenga Gitahi (PhD) Mount Kigali University

DOI:

https://doi.org/10.53819/81018102t5468

Abstract

The study examined the influence of Monitoring and Evaluation (M&E) planning practices on performance of education projects in Karongi District, Rwanda. The study adopted descriptive and correlational research designs within a mixed-methods approach. A sample of 187 respondents was selected from a target population of 350 using purposive, stratified random, and simple random sampling techniques. Data were collected through structured questionnaires and interviews. Quantitative data were analyzed using SPSS through descriptive statistics, Pearson correlation, and regression analysis, while qualitative data were analyzed thematically. The findings indicated that respondents agreed that M&E planning practices were implemented, with an overall mean score of 4.22. Pearson correlation analysis revealed a strong, positive, and statistically significant relationship between M&E planning practices and education project performance (r = 0.895, p < 0.01). The regression model explained 89.9% of the variation in project performance (R² = 0.899). Although M&E planning practices were closely associated with project performance, challenges remained in routine data collection, timely reporting, feedback mechanisms, and the systematic use of M&E findings to revise project plans. Education project performance was generally rated positively, particularly in learner achievement, innovative teaching practices, and adherence to project schedules. The study concludes that effective M&E planning is an important determinant of education project performance, as it supports implementation efficiency, accountability, and evidence-based decision-making. The study recommends strengthening M&E planning frameworks, establishing clear performance indicators and reporting schedules, and ensuring that monitoring findings inform corrective actions throughout project implementation. Further research should establish how specific dimensions of M&E planning influence education project outcomes in different contexts.

Keywords: Monitoring and Evaluation Planning; Education Projects; Project Performance; Monitoring and Evaluation Practices; Karongi District.

Author Biographies

Byamukama Didier , Mount Kigali University

School of Business and Economics, Mount Kigali University

Dr. Njenga Gitahi (PhD), Mount Kigali University

School of Business and Economics, Mount Kigali University

References

African Union & UNESCO. (2025). 2025 spotlight on basic education completion and foundational learning in Africa: Lead for foundational learning. Global Education Monitoring Report. https://www.unesco.org/gem-report/en/publication/2025spotlight

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.

Creswell, J. W., & Plano Clark, V. L. (2021). Designing and conducting mixed methods research (3rd ed.). SAGE Publications.

Gakomye, C., & Njenga, G. (2023). Monitoring and evaluation practices and sustainability of education project in Rwanda: A case of University of Rwanda–Sweden Program for Research, Higher Education, and Institutional Advancement. Journal of Entrepreneurship & Project Management, 7(10), 97–122. https://doi.org/10.53819/81018102t5249

Habarurema, M., & Akims, M. A. (2024). Effect of monitoring and evaluation practices on performance of construction projects in Gasabo District, Rwanda. International Journal of Entrepreneurship and Project Management, 9(3), 16–35. https://ideas.repec.org/a/bdu/oijepm/v9y2024i3p16-35id3024.html

Independent Evaluation Group. (2025). Results and performance of the World Bank Group 2025. World Bank Group. https://ieg.worldbankgroup.org/evaluations/results-and-performance-world-bank-group-2025/overview

Iribagiza, A., & Kirabo, J. (2024). Influence of project management practices on performance of projects in Rwanda. International Journal of Entrepreneurship and Project Management, 9(4), 36–54. https://ideas.repec.org/a/bdu/oijepm/v9y2024i4p36-54id3069.html

Jabongo, G. W. (2025). The influence of result-based monitoring on the performance of housing projects in Nairobi. Journal of Entrepreneurship and Project Management, 10(2), 20–32. https://ideas.repec.org/a/bhx/ojjepm/v10y2025i2p20-32id2852.html

Masvaure, S., & Fish, T. E. (2022). Strengthening and measuring monitoring and evaluation capacity in selected African programmes. African Evaluation Journal, 10(1), a635. https://doi.org/10.4102/aej.v10i1.635

Ministry of Education, Rwanda. (2024). Education sector strategic plan 2024–2029.

Ministry of Education, Rwanda. (2025). Education statistical yearbook 2024/2025.

National Institute of Statistics of Rwanda. (2025). EICV7: Thematic report—Education 2023/24. https://statistics.gov.rw/data-sources/surveys/EICV/integrated-household-living-conditions-survey-7-eicv-7/eicv7-thematic-report-education-202324

Ndayisaba, F., & Njenga, G. (2026). Effectiveness of result-based monitoring and evaluation on school performance in public secondary schools of Rulindo District, Rwanda. East African Journal of Arts and Social Sciences, 9(2), 251–266. https://doi.org/10.37284/eajass.9.2.4890

Organisation for Economic Co-operation and Development. (2021). Applying evaluation criteria thoughtfully. OECD Publishing. https://www.oecd.org/en/topics/sub-issues/development-co-operation-evaluation-and-effectiveness/evaluation-criteria.html

UNESCO Institute for Statistics. (2025). World education statistics 2025. UNESCO. https://www.uis.unesco.org/en/publication/world-education-statistics-2025

UNESCO. (2024). Global education monitoring report 2024/5: Leadership in education: Lead for learning. UNESCO.

United Nations Children's Fund. (2023). Revised evaluation policy of UNICEF. https://www.unicef.org/executiveboard/revised-evaluation-policy-unicef-srs-2023

Uwibambe, L., & Njenga, G. (2025). Monitoring and evaluation practices and performance of the energy projects in Rwanda: A case of Electricity Access Rollout Programme (EARP). International Journal of Entrepreneurship and Project Management, 10(1), 1–25. https://ideas.repec.org/a/bdu/oijepm/v10y2025i1p1-25id3193.html

Uwitonze, J. C., & Dushimimana, J. D. (2026). Effect of project management practices on the success of business development support services project in Rusizi District, Rwanda. East African Journal of Business and Economics, 9(3), 725–736. https://doi.org/10.37284/eajbe.9.3.5652

World Bank. (2021). Measuring and reporting results at the operational level. World Bank Group. https://thedocs.worldbank.org/en/doc/7b776fece25d919127d83a8a6a396da2-0290032021/original/Measuring-and-reporting-results-factsheet.pdf

World Bank. (2023). Setting up an effective monitoring and evaluation system: Construct a results framework. World Bank Group. https://thedocs.worldbank.org/en/doc/76cee7fe8530ca39831b55ee5bab9bce-0080012023/original/Brief-Setting-up-an-Effective-Monitoring-and-Evaluation-System.pdf

Yamane, T. (1967). Statistics: An introductory analysis (2nd ed.). Harper and Row.

Downloads

Published

2026-10-28

How to Cite

Didier , B., & Gitahi, N. (2026). Influence of Monitoring and Evaluation Planning Practices on Performance of Education Projects in Karongi District, Rwanda. Journal of Entrepreneurship & Project Management, 10(5), 13–26. https://doi.org/10.53819/81018102t5468

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>