Quality Assurance and Performance of High-Rise Building Projects in Kiambu County

Authors

  • Samuel Ngugi Jomo Kenyatta University of Agriculture and Technology
  • Dr. Peter Ngatia Jomo Kenyatta University of Agriculture and Technology

DOI:

https://doi.org/10.53819/81018102t3165

Abstract

The rapid expansion of high-rise building construction in Kiambu County has raised growing concerns about the quality and safety of these developments, with over 65% of inspected buildings exhibiting quality-related deficiencies between 2018 and 2023. Against this backdrop, this study examined the impact of quality assurance practices on the performance of high-rise building construction projects in Kiambu County, Kenya. Using a descriptive survey design, data were collected from 198 respondents drawn from a target population of 620 project stakeholders, including construction firms, project managers, engineers, architects, real estate developers, and county government officials. The findings revealed that quality assurance was a significant and strong predictor of project performance, with systematic audits, compliance frameworks, and regulatory enforcement playing a central role in shaping construction outcomes. However, training and awareness initiatives around building regulations were perceived less favorably, pointing to capacity-building gaps that limit the full potential of existing assurance mechanisms. The study recommends institutionalizing quality assurance through regular independent audits, strengthening contractor-regulatory authority collaboration, and dynamically updating regulatory frameworks to align with contemporary construction standards. These measures are essential for ensuring safety, compliance, and sustainability in Kiambu County's growing high-rise construction sector.

Keywords: Quality Assurance, Performance, High-Rise Building, Projects, Kiambu County

 

Author Biographies

Samuel Ngugi , Jomo Kenyatta University of Agriculture and Technology

MSc in Project Management, Jomo Kenyatta University of Agriculture and Technology

Dr. Peter Ngatia, Jomo Kenyatta University of Agriculture and Technology

Lecturer, Jomo Kenyatta University of Agriculture and Technology

References

Alu, A. J., Muritala, T. A., Ogedengbe, F. A., Gambo, N., & Nwoye, M. I. (2024). "Impact of Project Cost Control on the Financial Performance of the Nigerian Construction Industry: A Qualitative Approach". Open Journal of Business and Management, 12(4).

Architectural Association of Kenya. (2018). 'High-rise the way to go'. Retrieved from Standardmedia.co.ke.

Atamba, L., & Kwasira, T. (2023). "Quality Management Practices and Successful Completion of Building Construction Projects in Nakuru Town, KenyaQ. The International Journal of Business Management and Technology, 7(6), 1-11.

Caldeira, E. (2023). "General Mistakes made in Quality Control in Construction". Retrieved from https://blog.ftq360.com/blog/10-quality-control-mistakes-construction-companies-make

Chan, A. P., Scott, D., & Lam, E. W. (2004). "Framework of success criteria for design/build projects". ournal of Management in Engineering, 20(2), 120-128.

Chauhan, J., Subedi, S., Thakulla, A., & Khanal, S. R. (2023). "Project quality management". ResearchGate, 1-16.

Chen, P. (2024). "Understanding Quality Assurance (QA) Programme in Construction". Retrieved from https://hubble.build/newsroom/quality-assurance-qa-programme-construction

Construction Innovation Hub. (2020). "Construction Quality Planning Guide". Construction Quality Planning Guide.

County Governement of Kiambu. (2023). "County infrastructure complaints and enforcement report (2019-2023)." County Governement PressKiambu.

Eisenhardt, K. M. (1989). "Agency theory: An assessment and review. Academy of Management Review, 14(1), 57-74.

Els, R. C., & Meyer, H. W. (2025). "The influence of leaders’ attitudes and commitment to quality management of training on organisational excellence: a mixed-methods study". Human Resource Development International, 28(1), 79-109. doi:10.1080/13678868.2024.2315925

Enyinna, G., J.O.C, O., U.U, M., Nwokolo, N., Nmesoma, O., Okangba, S., . . . Okwara, I. (2024). "Impact of quality management on construction project in delivery in Nigeria". Journal of Management Information and Decision Sciences, 27(6), 1-17.

Gachingwa, D. N. (2022). "Total quality management practices and performance of commercial building construction projects in Nairobi County". MA thesis in project planning and management, University of Nairobi.

Gathu, S. N., & Nyang’au, S. P. (2025). "Quality management practices and affordable housing projects in Nairobi City County". Journal of Applied Social Sciences in Business and Management, 5(1), 152-166.

Jensen, M. C., & Meckling, W. H. (1976). "Theory of the firm: Managerial behavior, agency costs, and ownership structure". Journal of Financial Economics,, 3(4), 305-360.

Kasymov, R. (2024). "The Quality Management Plan in Project Management". Retrieved from https://maddevs.io/blog/quality-management-plan-in-project-management/

KERB. (2022). "Inspection report on structural compliance in high-rise buildings". Nairobi: Kenya Engineers Registration Board.

Kerzner, H. (2022). 'Project Management: A systems approach to planning, scheduling, and controlling' (13th ed.). New Jersey: John Wiley & Sons, Inc.

Kinyumu, A. W., & Mungai, A.-M. W. (2022). "Project Quality on the Performance of Bank-Financed Housing in the Nairobi Metropolitan Area". Social Sciences & Humanities Open, 3, 87-95.

Lima, A. B., Becerra, C. E., Feitosa, A. D., Albuquerque, A. P., Melo, F. J., & Medeiros, D. D. (2025). "Effective Practices for Implementing Quality Control Circles Aligned with ISO Quality Standards: Insights from Employees and Managers in the Food Industry". Standards, 5(1), 6. doi:10.3390/standards5010006

Love, P. E., Irani, Z., & Edwards, D. J. (2004). "A rework reduction model for construction projects". IEEE Transactions on Engineering Management, 51(4), 426-440.

Luvai, W. M., & Mungai, A. M. (2024). "Project integration management practices on implementation of selected high-rise building projects in Nairobi city county, Kenya". Int Journal of Social Sciences Management and Entrepreneurship, 8(2), 472-488.

Malinawan, M. G., & Shick, M. .. (2024). "Project Quality Management: A Guide for Project Managers". Retrieved from https://www.rosemet.com/project-quality-management/

Malsam, W. (2022). "Project Quality Management: A Quick Guide". Retrieved from projectmanager.com: https://www.projectmanager.com/blog/project-quality-management-quick-guide

Mohamed, G. S. (2023). "Quality management practices and the performance of road infrastructure projects in Wajir county". MBA thesis in project management, Kenyatta University.

Mukakarisa, C., & Njoroge, N. (2024). "Effect of Stakeholders’ Engagement on Performance of Construction Projects in Rwanda: Case of Horizon Construction Company". International Journal of Entrepreneurship and Project Management, 9(4), 22-35.

Murugi, A. M. (2022). "Factors contributing towards structural collapse of buildings: A case of Kiambu County, Kenya". MBA thesis, USIU-Africa.

NCA. (2023). " The NCA report". Nairobi: National Construction Authority.

Office of the Auditor General. (2023). 'The auditor general report on NG-CDF Gatundu North Constituency june 2021. Nairobi: Office of the Auditor General, Republic of Kenya.

Oni, O. Z., Amusan, L., Owolabi, J. D., & Akinbile, B. F. (2019). "Factors affecting quality management practices on building construction sites in Nigeria". 3rd International Conference on Science and Sustainable Development (pp. 1-12). IOP Conf Series. doi:10.1088/1742-6596/1299/1/012009

Ouma, J., & Omwenga, J. (2022). "Qulaity management practices and performance of county government infrastructural projects in Migori County, Kenya". The Strategic Journal of business & change management, 9(4), 582-595.

PlanRadar. (2022). "Construction quality assurance: Common challenges and how to solve them". Retrieved from https://www.planradar.com/au/construction-quality-assurance-common-challenges

PMI. (2021). "A Guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.)". Newton Square, PA: Project Management Institute.

Rahman, H., & Rashid, A. (2018). Project Success in the Eyes of Project Management Information System and Project Team members. Abasyn Journal of Social Sciences, 1-8.

Ramadhani, A. c., & Yusuf, M. (2019). Influence of project management practices on implementation of NGCDF projects in Nyali Constituency. International Journal of Management and Commerce Innovations, 7(1), 173-182.

Soon, L. C. (2021). "Investigating project cost management for high rise residential buildings". Masters in Project management, UniversitiTunku Abdul Rahman.

SreeMathy. (2023). " Best Practices in Construction Quality Assurance". Retrieved from https://www.tocobrick.com/blog/practices-in-construction-quality-assurance/

Stewart, O. (2024). "Quality assurance in construction". Retrieved from https://www.sablono.com/en/blog/quality-assurance-in-construction

Turner, J. R., & Simister, S. J. (2001). "Project contract management and a theory of organization". International Journal of Project Management, 19(8), 457-464.

Welege, N. M., Pan, W., & Kumaraswamy, M. M. (2022). Engaging stakeholders to overcome common constraints in delivering low-carbon buildings in high-rise, high-density cities. Journal of Construction Engineering and Management, 149(1). doi:10.1061/JCEMD4.COENG-12327

Downloads

Published

2026-03-11

How to Cite

Ngugi , S., & Ngatia, P. (2026). Quality Assurance and Performance of High-Rise Building Projects in Kiambu County. Journal of Entrepreneurship & Project Management, 10(1), 11–21. https://doi.org/10.53819/81018102t3165

Issue

Section

Articles