Quality Assurance and Performance of High-Rise Building Projects in Kiambu County
DOI:
https://doi.org/10.53819/81018102t3165Abstract
The rapid expansion of high-rise building construction in Kiambu County has raised growing concerns about the quality and safety of these developments, with over 65% of inspected buildings exhibiting quality-related deficiencies between 2018 and 2023. Against this backdrop, this study examined the impact of quality assurance practices on the performance of high-rise building construction projects in Kiambu County, Kenya. Using a descriptive survey design, data were collected from 198 respondents drawn from a target population of 620 project stakeholders, including construction firms, project managers, engineers, architects, real estate developers, and county government officials. The findings revealed that quality assurance was a significant and strong predictor of project performance, with systematic audits, compliance frameworks, and regulatory enforcement playing a central role in shaping construction outcomes. However, training and awareness initiatives around building regulations were perceived less favorably, pointing to capacity-building gaps that limit the full potential of existing assurance mechanisms. The study recommends institutionalizing quality assurance through regular independent audits, strengthening contractor-regulatory authority collaboration, and dynamically updating regulatory frameworks to align with contemporary construction standards. These measures are essential for ensuring safety, compliance, and sustainability in Kiambu County's growing high-rise construction sector.
Keywords: Quality Assurance, Performance, High-Rise Building, Projects, Kiambu County
References
Alu, A. J., Muritala, T. A., Ogedengbe, F. A., Gambo, N., & Nwoye, M. I. (2024). "Impact of Project Cost Control on the Financial Performance of the Nigerian Construction Industry: A Qualitative Approach". Open Journal of Business and Management, 12(4).
Architectural Association of Kenya. (2018). 'High-rise the way to go'. Retrieved from Standardmedia.co.ke.
Atamba, L., & Kwasira, T. (2023). "Quality Management Practices and Successful Completion of Building Construction Projects in Nakuru Town, KenyaQ. The International Journal of Business Management and Technology, 7(6), 1-11.
Caldeira, E. (2023). "General Mistakes made in Quality Control in Construction". Retrieved from https://blog.ftq360.com/blog/10-quality-control-mistakes-construction-companies-make
Chan, A. P., Scott, D., & Lam, E. W. (2004). "Framework of success criteria for design/build projects". ournal of Management in Engineering, 20(2), 120-128.
Chauhan, J., Subedi, S., Thakulla, A., & Khanal, S. R. (2023). "Project quality management". ResearchGate, 1-16.
Chen, P. (2024). "Understanding Quality Assurance (QA) Programme in Construction". Retrieved from https://hubble.build/newsroom/quality-assurance-qa-programme-construction
Construction Innovation Hub. (2020). "Construction Quality Planning Guide". Construction Quality Planning Guide.
County Governement of Kiambu. (2023). "County infrastructure complaints and enforcement report (2019-2023)." County Governement PressKiambu.
Eisenhardt, K. M. (1989). "Agency theory: An assessment and review. Academy of Management Review, 14(1), 57-74.
Els, R. C., & Meyer, H. W. (2025). "The influence of leaders’ attitudes and commitment to quality management of training on organisational excellence: a mixed-methods study". Human Resource Development International, 28(1), 79-109. doi:10.1080/13678868.2024.2315925
Enyinna, G., J.O.C, O., U.U, M., Nwokolo, N., Nmesoma, O., Okangba, S., . . . Okwara, I. (2024). "Impact of quality management on construction project in delivery in Nigeria". Journal of Management Information and Decision Sciences, 27(6), 1-17.
Gachingwa, D. N. (2022). "Total quality management practices and performance of commercial building construction projects in Nairobi County". MA thesis in project planning and management, University of Nairobi.
Gathu, S. N., & Nyang’au, S. P. (2025). "Quality management practices and affordable housing projects in Nairobi City County". Journal of Applied Social Sciences in Business and Management, 5(1), 152-166.
Jensen, M. C., & Meckling, W. H. (1976). "Theory of the firm: Managerial behavior, agency costs, and ownership structure". Journal of Financial Economics,, 3(4), 305-360.
Kasymov, R. (2024). "The Quality Management Plan in Project Management". Retrieved from https://maddevs.io/blog/quality-management-plan-in-project-management/
KERB. (2022). "Inspection report on structural compliance in high-rise buildings". Nairobi: Kenya Engineers Registration Board.
Kerzner, H. (2022). 'Project Management: A systems approach to planning, scheduling, and controlling' (13th ed.). New Jersey: John Wiley & Sons, Inc.
Kinyumu, A. W., & Mungai, A.-M. W. (2022). "Project Quality on the Performance of Bank-Financed Housing in the Nairobi Metropolitan Area". Social Sciences & Humanities Open, 3, 87-95.
Lima, A. B., Becerra, C. E., Feitosa, A. D., Albuquerque, A. P., Melo, F. J., & Medeiros, D. D. (2025). "Effective Practices for Implementing Quality Control Circles Aligned with ISO Quality Standards: Insights from Employees and Managers in the Food Industry". Standards, 5(1), 6. doi:10.3390/standards5010006
Love, P. E., Irani, Z., & Edwards, D. J. (2004). "A rework reduction model for construction projects". IEEE Transactions on Engineering Management, 51(4), 426-440.
Luvai, W. M., & Mungai, A. M. (2024). "Project integration management practices on implementation of selected high-rise building projects in Nairobi city county, Kenya". Int Journal of Social Sciences Management and Entrepreneurship, 8(2), 472-488.
Malinawan, M. G., & Shick, M. .. (2024). "Project Quality Management: A Guide for Project Managers". Retrieved from https://www.rosemet.com/project-quality-management/
Malsam, W. (2022). "Project Quality Management: A Quick Guide". Retrieved from projectmanager.com: https://www.projectmanager.com/blog/project-quality-management-quick-guide
Mohamed, G. S. (2023). "Quality management practices and the performance of road infrastructure projects in Wajir county". MBA thesis in project management, Kenyatta University.
Mukakarisa, C., & Njoroge, N. (2024). "Effect of Stakeholders’ Engagement on Performance of Construction Projects in Rwanda: Case of Horizon Construction Company". International Journal of Entrepreneurship and Project Management, 9(4), 22-35.
Murugi, A. M. (2022). "Factors contributing towards structural collapse of buildings: A case of Kiambu County, Kenya". MBA thesis, USIU-Africa.
NCA. (2023). " The NCA report". Nairobi: National Construction Authority.
Office of the Auditor General. (2023). 'The auditor general report on NG-CDF Gatundu North Constituency june 2021. Nairobi: Office of the Auditor General, Republic of Kenya.
Oni, O. Z., Amusan, L., Owolabi, J. D., & Akinbile, B. F. (2019). "Factors affecting quality management practices on building construction sites in Nigeria". 3rd International Conference on Science and Sustainable Development (pp. 1-12). IOP Conf Series. doi:10.1088/1742-6596/1299/1/012009
Ouma, J., & Omwenga, J. (2022). "Qulaity management practices and performance of county government infrastructural projects in Migori County, Kenya". The Strategic Journal of business & change management, 9(4), 582-595.
PlanRadar. (2022). "Construction quality assurance: Common challenges and how to solve them". Retrieved from https://www.planradar.com/au/construction-quality-assurance-common-challenges
PMI. (2021). "A Guide to the Project Management Body of Knowledge (PMBOK guide) (7th ed.)". Newton Square, PA: Project Management Institute.
Rahman, H., & Rashid, A. (2018). Project Success in the Eyes of Project Management Information System and Project Team members. Abasyn Journal of Social Sciences, 1-8.
Ramadhani, A. c., & Yusuf, M. (2019). Influence of project management practices on implementation of NGCDF projects in Nyali Constituency. International Journal of Management and Commerce Innovations, 7(1), 173-182.
Soon, L. C. (2021). "Investigating project cost management for high rise residential buildings". Masters in Project management, UniversitiTunku Abdul Rahman.
SreeMathy. (2023). " Best Practices in Construction Quality Assurance". Retrieved from https://www.tocobrick.com/blog/practices-in-construction-quality-assurance/
Stewart, O. (2024). "Quality assurance in construction". Retrieved from https://www.sablono.com/en/blog/quality-assurance-in-construction
Turner, J. R., & Simister, S. J. (2001). "Project contract management and a theory of organization". International Journal of Project Management, 19(8), 457-464.
Welege, N. M., Pan, W., & Kumaraswamy, M. M. (2022). Engaging stakeholders to overcome common constraints in delivering low-carbon buildings in high-rise, high-density cities. Journal of Construction Engineering and Management, 149(1). doi:10.1061/JCEMD4.COENG-12327